|

|
|
Projects Currently Operating or Under Construction
Torchiarolo (Brindisi)
Location: Puglia, Italy
Capacity: 8 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: Under Construction
|
 |
|
Cellino San Marco (Brindisi)
Location: Puglia, Italy
Capacity: 43 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: Under Construction
|
 |
|
Sault
Location: Sault, France
Capacity: 1.2 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: 2009
|
 |
|
Iktinos
Location: Florina, Greece
Capacity: 4.3 MWp
Panel: Poly-crystalline silicon
Role: Developer, owner, operator
Start of Operations: 2010
|
 |
|
Malagón
Location: Castilla La Mancha, Spain
Capacity: 8.0 MWp
Panel: Si Mono-Crystalline
Role: Owner, operator
Start of Operations: 2008
|
 |
|
Acula
Location: Andalucía, Spain
Capacity: 2.3 MWp
Panel: Cd-Te thin film
Role: Owner, Operator
Start of Operations: 2008
|
 |
|
Alcudia
Location: Andalucía, Spain
Capacity: 1.2 MWp
Panel: Cd-Te thin film
Role: Owner, Operator
Start of Operations: 2008
|
 |
|
Pedro Martínez
Location: Andalucía, Spain
Capacity: 1.3 MWp
Panel: Cd-Te thin-film
Role: Owner, operator
Start of Operations: 2008
|
 |
|
Alhama
Location: Andalucía, Spain
Capacity: 1.9 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: 2008
|
 |
|
Iznalloz
Location: Andalucía, Spain
Capacity: 2.9 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: 2008
|
 |
|
Villamesías
Location: Extremadura, Spain
Capacity: 2.4 MWp
Panel: Poly-crystalline silicon
Role: Developer, owner, operator
Start of Operations: 2008
|
 |
|
Alvarado
Location: Extremadura, Spain
Capacity: 5.8 MWp
Panel: Poly-crystalline silicon
Role: Developer, owner, operator
Start of Operations: 2008
|
 |
|
Darro
Location: Andalucía, Spain
Capacity: 5.8 MWp
Panel: Cd-Te thin-film
Role: Developer, owner, operator
Start of Operations: 2008
|
|